Review Committee Materials
Presentations
Key Reviews
- February DOE Annual Status Review; Panel Report; DESI Response
- Focal Plane Installation and Safety Review
- Focal Plane Cooling System Review
- DESI Data Internal Review April 2018
- Data Systems readiness for going on sky
Science Readiness
- Science Requirements
- Science Readiness Plan
- Survey Strategy
- Survey Validation Plan
- Bright Galaxy Survey Plan
- Target Selection Plan
- Imaging Requirements
- Imaging Validation Plan
- Cosmological Simulations Requirements
Documentation at CD-3
- Final Design Report (FDR)
- Project Execution Plan (PEP)
- Hazard Analysis Report (HAR) – signed
- Integrated Safety Management (PUB-3000, PUB-3140)
- Quality Assurance Plan (LBNL/PUB-3111)
- Risk Management Plan (RMP)
- National Environmental Policy Act (NEPA) Categorical Exclusion
Safety Documentation
- Root Cause Analysis of January Electrical Incident
- Mayall Crane Incident Report and Response
- Hazards Analysis Report
- Machine Protection Plan
- Machine Protection Hazard Registry
- Offsite Safety Report
- Installation and Commissioning Site Specific Safety Plan
- NOAO-North Standard Operating Practices for Kitt Peak Operations
- Kitt Peak Emergency Manual
- NOAO Stop Work Authority Policy
Other Project Documentation
- Contingency Rules
- Contingency Analysis
- Risk Registry
- WBS Dictionary and Work Authorization Document (WADs/CAPWA)
- Bottom-Up Estimate to Complete
- Cost Detail
- Schedule Detail
- Responsibility Assignment Matrix (RAM)
- Cost and Schedule Assumptions
- Systems Engineering Plan
- Resource Loaded Schedule in P6
- Monthly Reports to DOE
- Cost Performance Reports
- Baseline Change Proposals
- Computing Resource Letter from DOE-OHEP
- DOE-NSF Memorandum of Agreement During Construction
Background
Science Collaboration